Soil Class
What the site subsoil class (A–E) means for seismic design, where to find yours, and what to enter in Project Settings when you are not yet sure.
On this page
Soil Class in Project Settings is the site subsoil class of NZS 1170.5. It describes how the ground beneath your site responds to earthquake shaking, and ArchiSuite reads it when a calculator works out seismic design actions — for example the bracing portals, the retaining walls and the Masonry Foundation Wall. See Site subsoil class.
What soil class does#
Softer, deeper soils amplify earthquake shaking more than rock does, so the same earthquake produces larger design forces on a soft site than on a stiff one. The site subsoil class captures that: it scales the seismic demand your calculation uses. Getting it wrong in the unsafe direction means the seismic actions — and the members and connections sized from them — can be under-estimated.
The classes (NZS 1170.5, clause 3.1.3)#
NZS 1170.5 sorts sites into five classes from stiffest to softest:
| Class | Site | In short |
|---|---|---|
| Class A | Strong rock | Hard rock near the surface |
| Class B | Rock | Rock |
| Class C | Shallow soil | Not A, B or E, with a low-amplitude site period of 0.6 s or less |
| Class D | Deep or soft soil | Not A, B or E, with a site period greater than 0.6 s |
| Class E | Very soft soil | More than about 10 m of very soft soil (shear-wave velocity below 150 m/s) |
Classes A and B are rock sites and are usually straightforward to identify. The boundary between C and D — the one most NZ sites sit near — is the site period of 0.6 s, which is established from the soil profile (for example a shear-wave velocity measurement), not from a surface description. E is a specific very-soft-soil condition and carries the largest amplification.
Where to find your soil class#
Your geotechnical report. A site-specific geotechnical report normally states the NZS 1170.5 site subsoil class directly, or gives the soil profile and site period it was determined from. This is the reliable source.
A geotechnical professional. Where you have no report, or the report does not state a class, a geotechnical engineer can establish it from the ground conditions and testing.
Soil class is not something to read off a street address or a surface look at the ground: the classes C, D and E depend on what the soil does at depth.
When to get a geotechnical classification#
Use Class D to begin a preliminary design, but obtain a verified classification before issue when:
the design is sensitive to the seismic actions (most bracing portal and retaining wall designs are);
the site may be very soft (Class E) — low-lying ground, reclaimed land, soft or organic soils, or a high water table — where Class D can under-estimate the demand; or
a council or reviewer asks for the basis of the classification.
A refined, site-specific class can also reduce conservatism where the ground is genuinely stiffer than the assumption.
NZS 3604 is not the same thing#
Two different NZS 3604 ideas are easy to confuse with the seismic soil class — keep them separate:
Site subsoil class A–E (used here) comes from NZS 1170.5, the earthquake-actions standard for specific engineering design. It is about seismic shaking. NZS 3604:2011 borrows the same A–E classes for its simplified timber-framed bracing tables, where an unknown class is taken as the most severe, Class E. ArchiSuite's specific-design calculators use the NZS 1170.5 class, which is why a confirmed classification matters rather than defaulting to the worst case.
"Good ground" and bearing capacity are a foundations concept (NZS 3604 / B1), about the soil's ability to carry load. They are entered separately in ArchiSuite as the Geotechnical Ultimate Bearing Capacity, not as the Soil Class. See Good ground.
A site can be "good ground" for bearing and still be a soft Class D or E for seismic design — the two describe different things.