What is "good ground" under NZS 3604?

Good ground permanently takes 300 kPa ultimate bearing pressure, excluding compressible soils, expansive clays and ground that could move 25 mm or more.

Author
ArchiSuite
Checked against sources:
Published:
On this page

"Good ground" is the test that decides whether the standard foundation details in NZS 3604 can be used. It means soil or rock that can permanently withstand an ultimate bearing pressure of 300 kPa, which is 100 kPa allowable with a factor of safety of 3.0. It excludes compressible ground (topsoil, soft clays, loose uncompacted gravel), expansive clays, and any ground that could foreseeably move 25 mm or more, for example from instability, liquefaction or tree roots. If the site isn't good ground, the foundations need specific engineering design or other guidance.

What is the exact definition?#

The definition is in NZS 3604:2011 clause 1.3. Acceptable Solution B1/AS1 (opens in a new tab) (second edition, effective 28 July 2025) repeats it and modifies it. In summary:

PartWhat it says
StrengthAny soil or rock capable of permanently withstanding an ultimate bearing pressure of 300 kPa, that is an allowable bearing pressure of 100 kPa using a factor of safety of 3.0
Exclusion (a): compressible groundTopsoil; soft soils such as clay that can be moulded easily in the fingers; uncompacted loose gravel with obvious voids
Exclusion (b): expansive soilsSoils with a liquid limit over 50% (NZS 4402 Test 2.2) and a linear shrinkage over 15% from the liquid limit (NZS 4402 Test 2.6)
Exclusion (c): ground that could moveAny ground that could foreseeably move 25 mm or more for any reason, alone or combined. The listed causes are land instability, ground creep, subsidence, liquefaction, lateral spread, seasonal swelling and shrinking, frost heave, changing ground water level, erosion, dissolution of soil in water, and the effects of tree roots

The words "liquefaction, lateral spread" in exclusion (c) are B1/AS1's addition to the NZS 3604 wording. B1/AS1 makes the same change to the good ground definition in NZS 4299 (earth buildings).

What changed in 2025?#

MBIE issued B1/AS1 as a second edition, effective 28 July 2025. The first edition could only be used for consent applications made before 1 August 2026, so the second edition is now the one that applies. The level of performance didn't change. But the good ground rules are now set out up front:

  • section 1.2.1 explains how good ground is established

  • section 1.1.2.2 states that foundations for houses where good ground hasn't been established and the ground could liquefy or spread laterally are outside the scope of B1/AS1.

How is good ground tested?#

NZS 3604 sets out a site investigation procedure. MBIE's Canterbury guidance describes the standard NZS 3604 tests as hand auger holes and Scala penetrometer tests. MBIE's Canterbury guidance notes that procedure prescribes investigation to about 2 m. In Canterbury it recommended boreholes to 3–4 m where practical, to check for peat.

B1/AS1 gives a penetrometer criterion as a comment. Soils not excluded by (a), (b) or (c) are acceptable as good ground if a dynamic cone penetrometer (commonly called a Scala penetrometer), used to NZS 4402 Test 6.5.2, shows at least:

  • 5 blows per 100 mm down to a depth of twice the footing width, and

  • 3 blows per 100 mm below twice the footing width,

with depths measured from the underside of the proposed footing.

Two cautions:

  • The penetrometer doesn't check the exclusions. A site can pass the blow count and still be expansive, filled, peaty or liquefiable. Those need to be ruled out separately, for example by reasonable enquiry with the council, soil classification tests or a geotechnical engineer.

  • The 300 kPa is an index value. MBIE's Canterbury guidance explains that bearing values estimated from penetrometer results are only indices for residential, NZS 3604-type use. Actual bearing capacity depends on soil type, footing shape and water table depth.

What happens if the ground isn't good ground?#

NZS 3604's scope is limited to buildings founded on good ground. B1/AS1 adds a limited path for some single-storey houses on expansive soils. If good ground can't be confirmed:

  • An engineer designs the foundations. This is specific engineering design, often after a geotechnical investigation. B1/VM2 is MBIE's verification method for the geotechnical design of foundations. The engineer still has to derive soil parameters and check settlement and slope stability, which VM2 leaves outside its scope.

  • Reduced bearing. Where the ground is firm but under the 300 kPa index, the engineer may check actual bearing stresses and size wider footings or a stiffened raft to suit.

  • Liquefaction-prone sites. MBIE's Canterbury guidance (TC1, TC2 and TC3) may be appropriate, as B1/AS1 notes. See What are TC1, TC2 and TC3 ground?.

For the options by ground type, see Which foundations suit different ground conditions?.

Is good ground the same as soil class?#

No. Good ground is about whether the shallow soil under the footings can carry the house without excessive settlement or movement. Soil class (site subsoil class) is used to work out earthquake actions under NZS 1170.5, which B1/VM1 cites. It describes the deeper soil profile and how it affects shaking. The two are assessed differently and one doesn't tell you the other; see the soil class guide.

MBIE's Canterbury guidance treats TC1 land as most likely to be good ground, subject to the usual tests. It treats TC2 and TC3 land as outside the definition.

Key points#

  • Good ground: permanently withstands 300 kPa ultimate bearing pressure (100 kPa allowable, factor of safety 3.0).

  • It excludes compressible ground, expansive soils (liquid limit over 50% and linear shrinkage over 15%), and ground that could move 25 mm or more for any listed reason, now including liquefaction and lateral spread.

  • B1/AS1's penetrometer criterion: at least 5 blows per 100 mm to twice the footing width, then 3 blows per 100 mm, under NZS 4402 Test 6.5.2.

  • Passing the penetrometer test doesn't rule out the exclusions.

  • If good ground isn't established, foundations need specific engineering design, and liquefaction-prone ground is outside B1/AS1.

Sources

  1. Acceptable Solution B1/AS1 - Structural provisions for buildings (second edition, effective 28 July 2025), 1.1.2.2, 1.2.1, 2.3.3, 2.3.8 and Appendix B (opens in a new tab) - MBIE (building.govt.nz) (accessed 20 November 2026)
  2. Repairing and rebuilding houses affected by the Canterbury earthquakes - Part A Technical guidance (version 3, December 2012), sections 3.1 and 3.4.1 (opens in a new tab) - MBIE (building.govt.nz) (accessed 20 November 2026)
  3. Verification Method B1/VM2 - Geotechnical design of foundations (second edition, effective 28 July 2025) (opens in a new tab) - MBIE (building.govt.nz) (accessed 20 November 2026)
  4. Verification Method B1/VM1 - Structural design of buildings (second edition, effective 28 July 2025) (opens in a new tab) - MBIE (building.govt.nz) (accessed 20 November 2026)
  5. NZS 3604:2011 Timber-framed buildings - product page (opens in a new tab) - Standards New Zealand (accessed 20 November 2026)

General information about New Zealand rules, not advice for a particular project. Your council confirms whether your project needs building consent, and a suitably qualified professional should check any design.