This worked example takes one real design through the Bracing Portal Supporting Roof Only calculator, from Project Settings to an accepted calculation in Project Outputs and the documents it produces. The calculator designs a single-bay steel portal frame that carries roof load and provides bracing, such as the frame around a garage door. It chooses the lightest steel section that passes every check of the frame, its members, its column bases and the portal beam, and designs the foundation under each column for three foundation conditions. Every value below was entered in ArchiSuite, and every result was read from it.
Video tutorial#
The example project#
A steel portal frame around the double door opening at the front of a single-storey garage. It spans 5 m between column centres on 2.7 m columns, and carries the roof only: light roofing on framing spanning 7.2 m onto the portal beam, with a 0.6 m eave. The building's bracing design asks this portal for 120 wind and 80 earthquake bracing units.
What the example assumes:
The bracing demand (wind and earthquake bracing units) comes from the building's bracing design. The calculator does not work it out: it designs the portal to provide it.
The portal beam is flat and the roof framing bears on it. The roof is light.
The values are an illustration. They are not defaults for your project.
Step 1: Check the project information#
A bracing portal reads seven values from the active project's Project Settings. The example uses:
| Project Setting | Value used | Unit | Why it matters here |
|---|---|---|---|
| Wind Zone | High | The wind pressure on the roof: the uplift the portal columns and their footings must hold down. | |
| Snow Zone | N1 | With the elevation and the roof pitch, sets the snow load on the roof. | |
| Elevation | 50 | m | The site's height above sea level, for the snow load. |
| Roof Pitch | 25 | ° | The roof slope, for the snow load on the roof a flat portal carries (a pitched portal uses its own pitch). |
| Earthquake Zone | 2 | The site's earthquake hazard, used in the portal's earthquake design with the soil class. | |
| Soil Class | C | The site subsoil class, used with the earthquake zone. | |
| Geotechnical Ultimate Bearing Capacity | 300 | kPa | Used in the foundation checks under each column. 300 kPa is the ultimate bearing pressure that good ground must withstand under NZS 3604; use your own site's value. |
These come from Project Settings and are not entered on the form. Select Portal frames under What are you designing? in Project Settings to show them all. If one is missing, the calculation is refused when you click Analyse Portal. The values here are an example; use your own site's.
Step 2: Open the calculator#
Make the project active. Its name is shown under Active project at the top of every page.
Click All Calculators in the sidebar.
Under Bracing Portals, choose Bracing Portal Supporting Roof Only.
Click Add Calculation, or New Calculation once the project has one.
Step 3: Enter the portal inputs#
The form has four sections: the portal frame, the roof, the bracing demand and the wall. The diagram above it shows the frame and its dimensions.
These are the exact values entered in the recording:
| Section | Field | Value used | Unit | What it means |
|---|---|---|---|---|
| General Info & Portal Frame | Calculation Name | PF1 - Garage door portal | - | Names the calculation in Project Outputs and on the drawings and calculations. |
| General Info & Portal Frame | Portal span, B | 5 | m | The distance between the centres of the two portal columns (more than 0 and up to 10.0 m). |
| General Info & Portal Frame | Column height, C | 2.7 | m | The height of the columns, up to 4.0 m and no more than the portal span. |
| General Info & Portal Frame | Portal pitch | 0 | ° | The pitch of the portal beam: 0 for a flat beam under the roof framing (enter 0 rather than leaving it blank), up to 45° for a pitched portal whose rafters are the roof. |
| General Info & Portal Frame | Section family | PFC | - | The steel sections the calculator may choose from: PFC (parallel flange channels) here. ANY lets it choose from PFC, UB and UC. PFC is already selected on a new calculation. |
| Roof | Roof type | Light | - | Light roofing (for example long-run metal). Light is already selected on a new calculation. |
| Roof | Roof loaded dimension | (left blank) | m | Left blank: the eaves width and roof span below give the loaded dimension instead (the form greys this field out once they are entered). |
| Roof | Eaves width, D | 0.6 | m | The eave overhang beyond the portal's wall line (0 to 1.0 m). |
| Roof | Roof span, A | 7.2 | m | The full span of the roof framing that bears on the portal beam. The calculator takes half of it plus the eaves width as the roof width the portal carries. |
| Bracing Demand | Wind bracing units | 120 | BU | The wind bracing demand this portal must resist, from the building's bracing design. The calculator does not work it out. |
| Bracing Demand | Earthquake bracing units | 80 | BU | The earthquake bracing demand this portal must resist (0 to 400 BU), from the bracing design. |
| Wall | Wall cladding type | Light cladding | - | The cladding of the garage walls. It does not change the steel: it tells the foundation check how much load the walls and roof already put on the slab edge beside each column (Q*). |
A few points from the recording:
Enter
0in Portal pitch (°) for a flat portal beam. A pitch above 0 makes a pitched portal whose rafters are the roof.Section family and Roof type already show PFC and Light on a new calculation. Check each one against your design rather than leaving it as it opened.
Give the roof one way only: the Roof loaded dimension, or the Eaves width and the full Roof span. Once the eaves width and roof span are entered, the loaded dimension field is greyed out. Here the portal carries half the 7.2 m span plus the 0.6 m eave.
Wall cladding type does not change the steel. It tells the foundation check how much load the walls and roof already put on the slab edge beside each column.
As soon as the portal, roof and bracing inputs are in, the form shows the uplift on each column footing above the Analyse Portal button. For this portal it read:
The uplift can be no more than 40 kN. Above it, the form says what to reduce and Analyse Portal waits. The live figure leaves out the steel beam's own weight, so it is a little higher than the uplift in the calculations.
Step 4: Run the calculation#
Click Analyse Portal. ArchiSuite reads the latest saved Project Settings and designs the frame. The Selected Portal Member table and the Foundation conditions assessed table appear below the form. If an input is out of range, the form says so beside the field and does not submit.
Step 5: Understand the results#
The Selected Portal Member#
These are the values ArchiSuite showed for this example:
| Member Designation | Type / Group | Max Defl Down (mm) | Max Defl Up (mm) | Rigidity Ratio | Capacity Ratio | Status |
|---|---|---|---|---|---|---|
| 200 PFC 22.9 | PFC | 6.59 | -4.70 | 2.22 | 4.19 | Pass |
What the columns mean:
Member Designation is the steel section chosen for the beam and both columns. The calculator tries the sections of your Section family from the lightest, and takes the first that passes every check: the frame under the bracing load, the members to NZS 3404, the column base connection to NZS 3101 and the portal beam under the roof loads.
Max Defl Down (mm) and Max Defl Up (mm) are the largest downward and upward deflections of the portal beam under the roof loads (upward under wind uplift).
Rigidity Ratio and Capacity Ratio come from the portal beam's own beam check. Each is limit ÷ calculated value (stiffness) or capacity ÷ demand (bending), so 1 or more passes.
Status is Pass only when every check passes, including those of the frame and its bases that are not in this table.
The foundation conditions#
Each column is designed for three foundation conditions, because where the column lands is only known on site:
| Mark | Condition | Strip enhancement | Pad | Result |
|---|---|---|---|---|
| Mark A and Mark B | Type 1 — Perimeter Edge Beam | 381 mm, 2-HD12 top and bottom | 350 × 350 × 300 deep, alternative, HD12 @ 250 each way, top and bottom | OK: strip enhancement or pad |
| Type 2 — Internal Ground Beam | 381 mm, 2-HD12 top and bottom | 350 × 350 × 300 deep, alternative, HD12 @ 250 each way, top and bottom | OK: strip enhancement or pad | |
| Type 3 — Isolated Pad | – | 600 × 600 × 300 deep, HD12 @ 250 each way, top and bottom | OK: pad |
Type 1 — Perimeter Edge Beam: the column stands on the slab's perimeter edge beam. Here the edge beam needs a strip enhancement (the length and bars given) or, as an alternative, the pad.
Type 2 — Internal Ground Beam: the column stands on an internal ground beam, with the same choice.
Type 3 — Isolated Pad: the column stands on its own pad in the slab, which must be built.
The calculation's instruction: "Build the foundation of the condition found on site. Where a strip enhancement and a pad are both given for Type 1 or Type 2, build one, not both."
The design summary in the calculations#
The Structural Calculations open with a design summary:
| Item | Adopted |
|---|---|
| Portal beam and columns | 200 PFC 22.9 |
| Geometry | Span 5.00 m, column height 2.70 m |
| Bracing capacity | 145 BU wind, 116 BU earthquake |
| Column base actions (ULS) | 13.03 kN down, 13.04 kN uplift, 6.57 kN shear |
| Column footing uplift (ULS) | 9.18 kN (Kc 0.8 on the roof's wind, roof G 0.35 kPa) |
| Type 1 edge beam | Strip 381 mm, 2-HD12; or pad 350 × 350 × 300 deep |
| Type 2 ground beam | Strip 381 mm, 2-HD12; or pad 350 × 350 × 300 deep |
| Type 3 isolated pad | Pad 600 × 600 × 300 deep |
The frame provides more bracing than the 120 wind and 80 earthquake units asked of it. The column footing uplift in the calculations, 9.18 kN, is the design value; the live check on the form showed a little more because it leaves out the beam's weight.
The governing checks#
The calculations list the governing checks. Utilisation is demand ÷ capacity or limit; a utilisation of 1 or less passes.
| Part | Check | Demand | Capacity or limit | Utilisation |
|---|---|---|---|---|
| Frame under the bracing load | Sway at the eaves (SLS) | 7.44 mm | 9.00 mm | 0.83 |
| Frame under the bracing load | Frame members, NZS 3404 (ULS) | - | - | 0.32 |
| Frame under the bracing load | Base connection, NZS 3101 (ULS) | - | - | 0.23 |
| Beam under roof loads | Bending (ULS) | 12.25 kNm | 51.36 kNm | 0.24 |
| Beam under roof loads | Shear (ULS) | 9.80 kN | 171.07 kN | 0.06 |
| Type 1: perimeter edge beam | Pad: bearing pressure (G; ψcQ; Ws) | 88.3 kPa | 100.0 kPa | 0.88 |
| Type 2: internal ground beam | Pad: bearing pressure (G; ψcQ; Ws) | 88.3 kPa | 100.0 kPa | 0.88 |
| Type 3: internal isolated pad | Pad: uplift (0.9G + wind or earthquake) – governs | 9.18 kN | 9.77 kN | 0.94 |
The document's conclusion:
What the checks show for this portal:
The foundation governs: the Type 3 isolated pad holding the column down against uplift (0.94: 9.18 kN of uplift against 9.77 kN of resistance from the pad and the slab around it).
The frame is governed by its sway at the eaves under the bracing load (0.83). The members and the column base connection have plenty in hand.
The beam bending utilisation of 0.24 is the inverse of the Capacity Ratio in the Summary.
Step 6: Accept and access the documentation#
Check that the row shows Pass, then click Accept in the table header. ArchiSuite shows:
Open Project Outputs from the sidebar. The calculation is listed under Accepted calculator outputs included with its status.
What you can see and download, and when:
On screen. The selected member, the live uplift check and the foundation conditions are in the calculator itself as soon as you analyse.
The document packs. Project Outputs offers three PDFs: the Project Summary, the Structural Calculations (the design basis, the frame, its members and base connection, the beam, the column reactions and the foundations) and the Structural Drawings. They download once every accepted output is paid.
Documents that wait for review. Where an Engineering Review is included (it always is for an account without a Licensed Building Practitioner number), the downloads also wait until ArchiSuite has reviewed the documents and released them for issue. See Pay and download your documents.
Once the review is released, the panel says so and every download opens.
The video ends with a quick look through the documents this example produced, as issued: the Project Summary; the PS1 Producer Statement - Design and its Schedule, shown unsigned with the signatory withheld; the B2 durability letter and the Letter of Limited Review; every page of the Structural Calculations; and every sheet of the Structural Drawings, including the foundation condition key and the strip and pad details.
Common mistakes#
Missing Project Settings. The calculation is refused with a message naming the setting. Select Portal frames under What are you designing? in Project Settings, complete all seven values and click Update Project. See Project settings missing.
Leaving Portal pitch blank. Enter
0for a flat portal beam.Guessing the bracing units. Take the wind and earthquake bracing units from the building's bracing design. The calculator designs the portal to provide them; it does not work them out.
Entering the roof twice. Enter the roof loaded dimension, or the eaves width and roof span, not both.
Uplift over 40 kN. The form says what to reduce: the span or the roof loaded dimension, the bracing units, or the column height.
No section passes. Try another Section family, or ANY, a shorter span, or less bracing from this portal. See No member passes.
Building the wrong foundation. Build the foundation for the condition found on site, and for Type 1 or Type 2 build the strip enhancement or the pad, not both.
The same name twice. Each calculation in a project needs its own name. Change the Calculation Name.
Related guides#
Bracing Portal Supporting Roof Only: every input, result and refusal of this calculator.
Open the calculator from All Calculators → Bracing Portals (signed in).
The inputs explained: Portal span, Column height, Section family, Roof type, Roof loaded dimension, Wind bracing units, Earthquake bracing units, Wall cladding weight and Geotechnical Ultimate Bearing Capacity.
The other bracing portal worked examples: Roof, Wall, and Floor and Roof, Wall, Floor & Beams.
Project Settings, Check and accept results and Pay and download your documents.
Engineering note#
Recorded with CALC-038 Bracing Portal Supporting Roof Only version 4.1.0 on 2026-11-24.
Video transcript#
0:07 The project Worked Example - Bracing Portal Roof Only is active. Under What are you designing?, Portal frames is selected, and the calculator reads seven Project Settings: Wind Zone High, Snow Zone N1, Elevation 50 m, Roof Pitch 25 degrees, Earthquake Zone 2, Soil Class C and a Geotechnical Ultimate Bearing Capacity of 300 kPa.
0:18 Under All Calculators, in Bracing Portals, open Bracing Portal Supporting Roof Only, then Add Calculation. It designs a single-bay steel portal frame that carries roof load only and provides bracing, such as the frame around a garage door opening.
0:29 The calculation is named PF1 - Garage door portal. The portal spans 5 m between column centres, with 2.7 m columns. The portal pitch is 0 for a flat portal beam under the roof framing, and the section family is PFC.
0:47 In Roof, the roof is Light. Instead of the roof loaded dimension, the eaves width, 0.6 m, and the full roof span, 7.2 m, are entered: the calculator takes half the span plus the eaves width as the roof width the portal carries.
1:00 In Bracing Demand, the portal must resist 120 wind and 80 earthquake bracing units, from the building's bracing design. In Wall, the garage cladding is light; it is used only for the foundation check. Above the Analyse Portal button, the form shows the uplift on each column footing as the inputs are entered; it can be no more than 40 kN.
1:18 Analyse Portal runs the calculation. The Selected Portal Member table and the foundation conditions appear below the form.
1:26 The calculator chose 200 PFC 22.9, the lightest section in the PFC family that passes the portal frame, member, base connection and beam checks. The beam deflects 6.59 mm down and -4.70 mm up, and the Status is Pass.
1:42 Below it, Foundation conditions assessed: each column is designed for three conditions, a perimeter edge beam (Type 1), an internal ground beam (Type 2) and an isolated pad (Type 3), with the strip enhancement or pad each needs. The drawings carry the same three.
1:50 Accept adds the calculation to Project Outputs.
1:56 Project Outputs lists PF1 - Garage door portal as an accepted output. The Structural Calculations and Structural Drawings, with the full checks and the foundation details, download from here once the outputs are paid and, where Engineering Review is included, reviewed and released. Prices are hidden in this video.
2:08 After payment and Engineering Review (not shown), Project Outputs shows the document packs ready to download. A quick look through what they contain: the Project Summary, with the project and every accepted calculation; the PS1 Producer Statement - Design and its Schedule, shown here unsigned with the signatory withheld; the B2 durability letter and the Letter of Limited Review; the Structural Calculations; and the Structural Drawings.