Worked example · CALC-041
How to Use the Bracing Portal Supporting Roof, Wall, Floor & Beams Calculator: Worked Example
A step-by-step worked example of the Bracing Portal Supporting Roof, Wall, Floor & Beams calculator, with a screen-recorded video - a garage portal with a floor beam bearing on it, from Project Settings to the accepted calculation, its foundation conditions and its documents.
- Author
- ArchiSuite
- Technical review:
- Michael Sheridan
- Reviewed:
- Published:
On this page
This worked example takes one real design through the Bracing Portal Supporting Roof, Wall, Floor & Beams calculator, from Project Settings to an accepted calculation in Project Outputs and the documents it produces. The calculator designs a single-bay steel portal frame under an upper storey: the portal beam carries the roof, the upper-storey wall and the floor joists, and also one to three floor beams that bear on it as point loads. The frame provides bracing. It chooses the lightest steel section that passes every check, and designs the foundation under each column for three foundation conditions. Every value below was entered in ArchiSuite, and every result was read from it.
Video tutorial#
The example project#
The garage portal of the Roof, Wall, and Floor example, in a house where a floor beam also bears on the portal beam. The portal spans 5 m on 2.7 m columns and carries the 2.4 m upper-storey wall, the timber floor (joists spanning 4.0 m onto the beam) and the light roof (8 m span, 0.6 m eave). A floor beam spanning 4 m and carrying 3 m of floor bears on the portal beam 1.8 m from the left-hand column. Bracing demand: 150 wind and 120 earthquake bracing units.
What the example assumes:
The bracing demand (wind and earthquake bracing units) comes from the building's bracing design. The calculator does not work it out: it designs the portal to provide it.
The floor joists bear on the portal beam from one side only (the garage front is an outside wall), so the beam carries half their span.
One floor beam bears on the portal beam. The portal's own Floor span (its floor loaded dimension) leaves out the floor that reaches it through that floor beam. With no floor beam, use the Roof, Wall, and Floor calculator instead.
The values are an illustration. They are not defaults for your project.
Step 1: Check the project information#
A bracing portal reads seven values from the active project's Project Settings. The example uses:
| Project Setting | Value used | Unit | Why it matters here |
|---|---|---|---|
| Wind Zone | High | The wind pressure on the roof: the uplift the portal columns and their footings must hold down. | |
| Snow Zone | N1 | With the elevation and the roof pitch, sets the snow load on the roof. | |
| Elevation | 50 | m | The site's height above sea level, for the snow load. |
| Roof Pitch | 25 | ° | The roof slope, for the snow load on the roof a flat portal carries (a pitched portal uses its own pitch). |
| Earthquake Zone | 2 | The site's earthquake hazard, used in the portal's earthquake design with the soil class. | |
| Soil Class | C | The site subsoil class, used with the earthquake zone. | |
| Geotechnical Ultimate Bearing Capacity | 300 | kPa | Used in the foundation checks under each column. 300 kPa is the ultimate bearing pressure that good ground must withstand under NZS 3604; use your own site's value. |
These come from Project Settings and are not entered on the form. Select Portal frames under What are you designing? in Project Settings to show them all. If one is missing, the calculation is refused when you click Analyse Portal. The values here are an example; use your own site's.
Step 2: Open the calculator#
Make the project active. Its name is shown under Active project at the top of every page.
Click All Calculators in the sidebar.
Under Bracing Portals, choose Bracing Portal Supporting Roof, Wall, Floor & Beams.
Click Add Calculation, or New Calculation once the project has one.
Step 3: Enter the portal inputs#
The form has six sections: the portal frame, the roof, the wall, the floor, the floor beam point loads and the bracing demand. The diagram above it shows the frame and its dimensions.
These are the exact values entered in the recording:
| Section | Field | Value used | Unit | What it means |
|---|---|---|---|---|
| General Info & Portal Frame | Calculation Name | PF3 - Garage portal with floor beam | - | Names the calculation in Project Outputs and on the drawings and calculations. |
| General Info & Portal Frame | Portal span, B | 5 | m | The distance between the centres of the two portal columns (more than 0 and up to 10.0 m). |
| General Info & Portal Frame | Column height, C | 2.7 | m | The height of the columns, up to 4.0 m and no more than the portal span. |
| General Info & Portal Frame | Portal pitch | 0 | ° | The pitch of the portal beam: 0 for a flat beam under the roof framing (enter 0 rather than leaving it blank), up to 45° for a pitched portal whose rafters are the roof. |
| General Info & Portal Frame | Section family | PFC | - | The steel sections the calculator may choose from: PFC (parallel flange channels) here. ANY lets it choose from PFC, UB and UC. PFC is already selected on a new calculation. |
| Roof | Roof type | Light | - | Light roofing (for example long-run metal). Light is already selected on a new calculation. |
| Roof | Roof loaded dimension | (left blank) | m | Left blank: the eaves width and roof span below give the loaded dimension instead (the form greys this field out once they are entered). |
| Roof | Eaves width, D | 0.6 | m | The eave overhang beyond the portal's wall line (0 to 1.0 m). |
| Roof | Roof span, A | 8 | m | The full span of the roof framing that bears on the portal beam. The calculator takes half of it plus the eaves width as the roof width the portal carries. |
| Wall | Lower-storey wall cladding | Light | - | The cladding of the garage storey. It is used only in the foundation check, for the load the walls already put on the slab edge. Light is already selected on a new calculation. |
| Wall | Upper-storey wall cladding | Light | - | The cladding of the wall the portal beam carries: light weatherboards here. It cannot be heavier than the lower storey's. |
| Wall | Wall height | 2.4 | m | The height of that upper-storey wall (0.3 to 4.8 m). Its weight is applied along the whole portal span. |
| Floor | Floor type | Timber Floor | - | A timber-framed floor. Timber Floor is already selected on a new calculation. |
| Floor | Floor span | 2 | m | Despite the label, the floor LOADED DIMENSION of the portal beam: the joists span 4.0 m from the beam, so the beam carries half, 2 m. Over-stating it is not conservative: the floor weight also holds the portal down against uplift. |
| Floor Beam Point Load(s) | Floor beam span, L | 4 | m | The span of the floor beam that bears on the portal beam (up to 10.0 m). |
| Floor Beam Point Load(s) | Floor beam loaded dimension | 3 | m | The width of floor that floor beam carries (up to 6.0 m). The calculator applies half the floor load it carries as a point load on the portal beam; you do not enter a load. |
| Floor Beam Point Load(s) | Point position, a | 1.8 | m | Where the floor beam bears, measured from the centre of the left-hand column (between 0 and the portal span). |
| Bracing Demand | Wind bracing units | 150 | BU | The wind bracing demand this portal must resist, from the building's bracing design. The calculator does not work it out. |
| Bracing Demand | Earthquake bracing units | 120 | BU | The earthquake bracing demand this portal must resist (0 to 400 BU), from the bracing design. |
A few points from the recording:
Enter
0in Portal pitch (°) for a flat portal beam.Section family, Roof type, both wall claddings and Floor type already show a value on a new calculation. Check each one against your design rather than leaving it as it opened.
Give the roof one way only: the Roof loaded dimension, or the Eaves width and the full Roof span.
Floor span (m) is the portal beam's floor loaded dimension, not the joist span. The joists here span 4.0 m from the beam, so the beam carries half: 2 m. Where joists bear from both sides, add half of each span. Do not over-state it: the floor's weight also holds the portal down against uplift.
The Lower-storey wall cladding is used only in the foundation check. The upper storey cannot have a heavier cladding than the lower one.
Floor Beam Point Load(s) has one row on a new calculation; add up to three. You do not enter a load: the calculator applies half the floor load the floor beam carries (from its span and loaded dimension) as a point load at Point position, a, measured from the centre of the left-hand column.
As soon as the inputs are in, the form shows the uplift on each column footing above the Analyse Portal button. For this portal it read:
The uplift can be no more than 40 kN. The live figure leaves out the steel beam's own weight, so it is a little higher than the uplift in the calculations.
Step 4: Run the calculation#
Click Analyse Portal. ArchiSuite reads the latest saved Project Settings and designs the frame. The Selected Portal Member table and the Foundation conditions assessed table appear below the form. If an input is out of range, the form says so beside the field and does not submit.
Step 5: Understand the results#
The Selected Portal Member#
These are the values ArchiSuite showed for this example:
| Member Designation | Type / Group | Max Defl Down (mm) | Max Defl Up (mm) | Rigidity Ratio | Capacity Ratio | Status |
|---|---|---|---|---|---|---|
| 250 PFC 35.5 | PFC | 7.99 | -0.13 | 1.62 | 1.99 | Pass |
What the columns mean:
Member Designation is the steel section chosen for the beam and both columns: the lightest in your Section family that passes the frame, member, base connection and beam checks. The floor beam's point load needs a deeper channel than the Roof, Wall, and Floor example's.
Max Defl Down (mm) and Max Defl Up (mm) are the largest downward and upward deflections of the portal beam. The wall, floor and floor beam weight keep the upward deflection very small.
Rigidity Ratio and Capacity Ratio come from the portal beam's own beam check: limit ÷ calculated deflection and capacity ÷ demand in bending, so 1 or more passes.
Status is Pass only when every check passes, including those of the frame and its bases that are not in this table.
The foundation conditions#
Each column is designed for three foundation conditions, because where the column lands is only known on site:
| Mark | Condition | Strip enhancement | Pad | Result |
|---|---|---|---|---|
| Mark A | Type 1 — Perimeter Edge Beam | Not available: strip enhancement not adequate | 550 × 550 × 300 deep, required, HD12 @ 250 each way, top and bottom | OK: pad required |
| Type 2 — Internal Ground Beam | Not available: strip enhancement not adequate | 550 × 550 × 300 deep, required, HD12 @ 250 each way, top and bottom | OK: pad required | |
| Type 3 — Isolated Pad | – | 550 × 550 × 300 deep, HD12 @ 250 each way, top and bottom | OK: pad | |
| Mark B | Type 1 — Perimeter Edge Beam | Not available: strip enhancement not adequate | 500 × 500 × 300 deep, required, HD12 @ 250 each way, top and bottom | OK: pad required |
| Type 2 — Internal Ground Beam | Not available: strip enhancement not adequate | 500 × 500 × 300 deep, required, HD12 @ 250 each way, top and bottom | OK: pad required | |
| Type 3 — Isolated Pad | – | 500 × 500 × 300 deep, HD12 @ 250 each way, top and bottom | OK: pad |
Each column is a mark of its own here. The floor beam bears nearer the left-hand column, so Mark A carries more and gets the larger pad.
Type 1 — Perimeter Edge Beam and Type 2 — Internal Ground Beam: with this much load, a strip enhancement of the beam is not enough (Not available), so the pad is required under the column.
Type 3 — Isolated Pad: the column stands on its own pad in the slab.
The calculation's instruction: "Build the foundation of the condition found on site."
The design summary in the calculations#
The Structural Calculations open with a design summary:
| Item | Adopted |
|---|---|
| Portal beam and columns | 250 PFC 35.5 |
| Geometry | Span 5.00 m, column height 2.70 m |
| Bracing capacity | 343 BU wind, 275 BU earthquake |
| Column base actions (ULS) | 36.44 kN down, 10.39 kN uplift, 11.88 kN shear |
| Column footing uplift (ULS) | 6.16 kN (Kc 0.8 on the roof's wind, roof G 0.68 kPa) |
| Type 1 edge beam | A: pad 550 × 550 × 300 deep; B: pad 500 × 500 × 300 deep |
| Type 2 ground beam | A: pad 550 × 550 × 300 deep; B: pad 500 × 500 × 300 deep |
| Type 3 isolated pad | A: pad 550 × 550 × 300 deep; B: pad 500 × 500 × 300 deep |
The frame provides more bracing than the 150 wind and 120 earthquake units asked of it. The pads differ between the columns: A, nearer the floor beam, and B.
The governing checks#
The calculations list the governing checks. Utilisation is demand ÷ capacity or limit; a utilisation of 1 or less passes.
| Part | Check | Demand | Capacity or limit | Utilisation |
|---|---|---|---|---|
| Frame under the bracing load | Sway at the eaves (ULS) | 11.80 mm | 27.00 mm | 0.44 |
| Frame under the bracing load | Frame members, NZS 3404 (ULS) | - | - | 0.36 |
| Frame under the bracing load | Base connection, NZS 3101 (ULS) | - | - | 0.38 |
| Beam under roof, wall, floor and floor beam loads | Bending (ULS) | 48.86 kNm | 97.47 kNm | 0.50 |
| Beam under roof, wall, floor and floor beam loads | Shear (ULS) | 36.44 kN | 285.12 kN | 0.13 |
| Type 1: perimeter edge beam | Pad: bearing pressure (1.2G; 1.5Q) – governs | 136.1 kPa | 150.0 kPa | 0.91 |
| Type 2: internal ground beam | Pad: bearing pressure (1.2G; 1.5Q) | 136.1 kPa | 150.0 kPa | 0.91 |
| Type 3: internal isolated pad | Pad: bearing pressure (1.2G; 1.5Q) | 136.1 kPa | 150.0 kPa | 0.91 |
The document's conclusion:
What the checks show for this portal:
The foundation governs: the ground bearing under the pad (0.91: 136.1 kPa against 150.0 kPa for the 1.2G + 1.5Q combination). The column's downward load from the roof, wall, floor and floor beam sizes the foundation, not uplift.
The frame is governed by its lateral capacity (0.44): the deeper section has plenty in hand for the bracing.
The beam bending utilisation of 0.50 is the inverse of the Capacity Ratio in the Summary.
Step 6: Accept and access the documentation#
Check that the row shows Pass, then click Accept in the table header. ArchiSuite shows:
Open Project Outputs from the sidebar. The calculation is listed under Accepted calculator outputs included with its status.
What you can see and download, and when:
On screen. The selected member, the live uplift check and the foundation conditions are in the calculator itself as soon as you analyse.
The document packs. Project Outputs offers three PDFs: the Project Summary, the Structural Calculations (the design basis, the frame, its members and base connection, the beam under the roof, wall, floor and floor beam loads, the column reactions and the foundations) and the Structural Drawings. They download once every accepted output is paid.
Documents that wait for review. Where an Engineering Review is included (it always is for an account without a Licensed Building Practitioner number), the downloads also wait until ArchiSuite has reviewed the documents and released them for issue. See Pay and download your documents.
Once the review is released, the panel says so and every download opens.
The video ends with a quick look through the documents this example produced, as issued: the Project Summary; the PS1 Producer Statement - Design and its Schedule, shown unsigned with the signatory withheld; the B2 durability letter and the Letter of Limited Review; every page of the Structural Calculations; and every sheet of the Structural Drawings, including the foundation condition key and the strip and pad details.
Common mistakes#
Entering the joist span as Floor span. Enter the floor loaded dimension of the beam: half the joist span from each side that bears on it.
Counting floor twice. Leave out of Floor span the floor that reaches the portal through a floor beam you list as a point load.
Measuring the point position from the wrong place. Point position, a is from the centre of the left-hand column to the centre of the floor beam's bearing, between 0 and the portal span.
No floor beam at all. Use Bracing Portal Supporting Roof, Wall, and Floor.
A heavier upper storey. The upper-storey cladding cannot be heavier than the lower storey's; the form will not submit.
Missing Project Settings. The calculation is refused with a message naming the setting. Select Portal frames under What are you designing? in Project Settings and complete all seven values. See Project settings missing.
Leaving Portal pitch blank. Enter
0for a flat portal beam.Guessing the bracing units. Take them from the building's bracing design.
Uplift over 40 kN. The form says what to reduce.
No section passes. Try another Section family, or ANY, a shorter span, or less bracing from this portal. See No member passes.
Building the wrong foundation. Build the foundation for the condition found on site, and for Type 1 or Type 2 build the strip enhancement or the pad, not both.
Related guides#
Bracing Portal Supporting Roof, Wall, Floor & Beams: every input, result and refusal of this calculator.
Open the calculator from All Calculators → Bracing Portals (signed in).
The inputs explained: Portal span, Column height, Section family, Roof type, Roof loaded dimension, Wall cladding weight, Wall height, Floor type, Floor loaded dimension, Floor beams on the portal, Floor beam span, Floor beam loaded dimension, Point position, Wind bracing units and Earthquake bracing units.
The other bracing portal worked examples: Roof Only and Roof, Wall, and Floor.
Project Settings, Check and accept results and Pay and download your documents.
Engineering note#
Recorded with CALC-041 Bracing Portal Supporting Roof, Wall, Floor & Beams version 4.1.0 on 2026-11-24.
Video transcript#
0:07 The project Worked Example - Bracing Portal with Floor Beam is active. Under What are you designing?, Portal frames is selected, and the calculator reads seven Project Settings: Wind Zone High, Snow Zone N1, Elevation 50 m, Roof Pitch 25 degrees, Earthquake Zone 2, Soil Class C and a Geotechnical Ultimate Bearing Capacity of 300 kPa.
0:18 Under All Calculators, in Bracing Portals, open Bracing Portal Supporting Roof, Wall, Floor & Beams, then Add Calculation. It designs a single-bay steel portal frame under an upper storey where, as well as the roof, wall and floor joists, one to three floor beams bear on the portal beam as point loads.
0:29 The calculation is named PF3 - Garage portal with floor beam. The portal spans 5 m between column centres, with 2.7 m columns. The portal pitch is 0 for a flat portal beam under the roof framing, and the section family is PFC.
0:49 In Roof, the roof is Light. Instead of the roof loaded dimension, the eaves width, 0.6 m, and the full roof span, 8 m, are entered: the calculator takes half the span plus the eaves width as the roof width the portal carries.
1:01 In Wall, both storeys have light cladding, and the upper-storey wall the portal beam carries is 2.4 m high. In Floor, the floor is timber. Floor span is the beam's floor loaded dimension, not the joist span: the joists span 4.0 m from the beam, so it carries 2 m.
1:20 In Floor Beam Point Loads, one floor beam bears on the portal beam 1.8 m from the left-hand column. It spans 4 m and carries 3 m of floor; the calculator works out the point load from these, so no load is entered.
1:29 In Bracing Demand, the portal must resist 150 wind and 120 earthquake bracing units, from the building's bracing design. Above the Analyse Portal button, the form shows the uplift on each column footing as the inputs are entered; it can be no more than 40 kN.
1:43 Analyse Portal runs the calculation. The Selected Portal Member table and the foundation conditions appear below the form.
1:51 The calculator chose 250 PFC 35.5, the lightest section in the PFC family that passes the portal frame, member, base connection and beam checks. The beam deflects 7.99 mm down and -0.13 mm up, and the Status is Pass.
2:07 Below it, Foundation conditions assessed: each column is designed for three conditions, a perimeter edge beam (Type 1), an internal ground beam (Type 2) and an isolated pad (Type 3), with the strip enhancement or pad each needs. The drawings carry the same three.
2:16 Accept adds the calculation to Project Outputs.
2:22 Project Outputs lists PF3 - Garage portal with floor beam as an accepted output. The Structural Calculations and Structural Drawings, with the full checks and the foundation details, download from here once the outputs are paid and, where Engineering Review is included, reviewed and released. Prices are hidden in this video.
2:34 After payment and Engineering Review (not shown), Project Outputs shows the document packs ready to download. A quick look through what they contain: the Project Summary, with the project and every accepted calculation; the PS1 Producer Statement - Design and its Schedule, shown here unsigned with the signatory withheld; the B2 durability letter and the Letter of Limited Review; the Structural Calculations; and the Structural Drawings.