Calculator guide · CALC-041

Bracing Portal Supporting Roof, Wall, Floor & Beams

Size a single-bay steel bracing portal that carries roof, wall above, timber floor and one to three floor beams, with its foundation designed for three foundation conditions.

Video: a worked example

One real design taken through this calculator, from Project Settings to the issued documents. Read the worked example and transcript
On this page

The Bracing Portal Supporting Roof, Wall, Floor & Beams calculator sizes a single-bay steel portal frame whose beam carries roof, a wall above, a timber floor, and one to three floor beams that bear on it. It sizes the frame from the wind and earthquake bracing units you enter, and the beam can be flat or pitched. ArchiSuite chooses the steel section, checks it as a frame and as a beam under all these loads, and designs the foundation under each portal column for three foundation conditions.

Bracing Portal Supporting Roof, Wall, Floor and Beams · CALC-041

Size a steel bracing portal carrying roof, wall and timber floor loads, including one to three floor beams.

Use it when

  • A single-bay portal supports an upper wall and timber floor.
  • Spans up to 10 m; column height no greater than the span.
  • One to three floor beams bear on the portal.
  • You have the required wind and earthquake bracing units.

Results

  • Steel section size and frame checks.
  • Slab-edge checks and pad-footing design.
  • Frame, connection and footing drawings.

Limits

  • Incoming floor beams carry floor loads only and require separate design.
  • No roof point loads or multi-bay frames.
  • PFC, UB and UC sections with standard connections and slab-edge details only.
  • The calculator does not determine the building’s bracing demand.

Before you start#

This calculator reads seven values from the active project's Project Settings. You do not enter them on the form:

  • Earthquake Zone and Soil Class

  • Wind Zone and Snow Zone

  • Elevation (0 to 800 m; it can be left blank for Snow Zone N0)

  • Roof Pitch (0 to 45°; not needed in Snow Zone N0)

  • Geotechnical Ultimate Bearing Capacity (150 to 300 kPa)

If any of these is blank or out of range, the calculation is refused with a message naming the setting.

Roof Pitch in Project Settings sets the snow load on the roof a flat portal carries. A pitched portal's rafters are the roof itself, so its snow load uses the Portal pitch (°) on this form instead. The Portal pitch (°) also sets the shape of the portal frame.

Have these ready:

  • The required wind and earthquake bracing units for the portal, from the building's bracing design. This calculator does not work out the bracing demand.

  • The portal span and column height.

  • The roof type, and either the roof loaded dimension or the eaves width and full roof span.

  • The cladding weight and height of the wall above the portal.

  • The floor loaded dimension on the portal beam.

  • For each floor beam that bears on the portal beam (at least one, up to three): its span, its loaded dimension, and its distance from the left-hand portal column.

Step by step#

  1. In the sidebar, click All Calculators. Choose the Bracing Portals tab, then the Bracing Portal Supporting Roof, Wall, Floor & Beams card.

  2. On the Bracing Portal Supporting Roof, Wall, Floor and Beams page, click New Calculation. If there are no calculations yet, click Add Calculation.

  3. In General Info & Portal Frame, enter:

    • Calculation Name (for example PF2 – Lounge portal)

    • Portal span, B (m) and Column height, C (m). The letters are the dimensions on the portal diagram above the form.

    • Portal pitch (°). Enter 0 for a flat beam; do not leave it blank.

    • Section family: PFC, UB, UC or ANY (the form starts on PFC).

  4. In Roof, choose the Roof type. Then enter either Roof loaded dimension (m), or both Eaves width, D (m) and Roof span, A (m). When you type in one option, the other fields are cleared and greyed out.

  5. In Wall, choose the Lower-storey wall cladding and the Upper-storey wall cladding, and enter the Wall height (m).

  6. In Floor, choose the Floor type (Timber Floor) and enter the Floor span (m): the floor loaded dimension of the portal beam, not the joist span.

  7. In Floor Beam Point Load(s), fill in Floor Beam Point Load #1: Floor beam span, L (m), Floor beam loaded dimension (m) and Point position, a (m). Click Add Floor Beam Point Load for a second or third floor beam. Click Remove to delete one (at least one must stay).

  8. In Bracing Demand, enter Wind bracing units (BU) and Earthquake bracing units (BU).

  9. Above the Analyse Portal button, check the uplift line, for example "Uplift on each column footing: about 6.9 kN (the most allowed is 40 kN)." It updates as you type.

  10. Click Analyse Portal. If the inputs are accepted, the Selected Portal Member table appears below the form, with the Foundation conditions assessed table under it.

  11. Check that the Status shows Pass, and that every row of the foundation conditions shows a result starting OK.

  12. Click Accept. You will see "Calculation accepted successfully!", the button changes to Accepted, and the calculation is added to Project Outputs.

Add one row for each floor beam that bears on the portal beam

To change a saved calculation, open it from the list. Edit the inputs and click Update Analysis.

The inputs#

General Info & Portal Frame. Portal span (B on the diagram) is the distance between the centres of the portal columns. Column height (C) cannot be more than the portal span. Both must be more than 0: the span can be up to 10.0 m and the column height up to 4.0 m. Portal pitch (°) is the pitch of the portal beam: 0 is a flat beam, a pitch above 0 makes a pitched portal, and it can be no more than 45°. Section family limits the steel sections the calculator can choose from. ANY lets it choose from PFC, UB and UC sections.

Roof. Roof type is Light or Heavy. Either enter the Roof loaded dimension directly (up to 7.0 m). Or enter the Eaves width, D (0 to 1.0 m) and the full Roof span, A (up to 12.0 m), and the calculator works out the loaded dimension as the eaves width plus half the roof span.

Wall. The Upper-storey wall cladding (Wall cladding weight) and Wall height (m) describe the wall the portal beam carries. The Lower-storey wall cladding is the cladding of the storey below; it is used only in the foundation check, with the upper-storey cladding and the roof. The upper storey cannot have a heavier cladding than the lower storey (NZS 3604:2011 Tables 5.9 and 5.10); the form says so and will not submit. The wall height must be from 0.3 m to 4.8 m. The wall load is the cladding weight multiplied by the wall height, applied along the whole portal span.

Floor. Floor type offers Timber Floor. Although it is labelled Floor span (m), the calculator uses this value as the portal beam's floor loaded dimension, and applies the floor load along the whole portal span. Enter the loaded dimension, not the joist span: joists that span 4.0 m onto the beam from one side give 2 m. Where joists bear on the beam from both sides, add half of each joist span. Do not include floor that reaches the portal through a floor beam you list below. Over-stating this value is not conservative, because the floor weight also holds the portal down in the uplift checks. The value must be more than 0 and no more than 6.0 m.

Floor Beam Point Load(s). Add one row for each floor beam that bears on the portal beam: at least one and up to three. You do not enter a load. For each floor beam, the calculator applies half the floor load it carries (the floor type loads × its loaded dimension × its span) as a point load at its position. Floor beam span, L (m) is the span of the floor beam itself (up to 10.0 m). Floor beam loaded dimension (m) is the width of floor that beam carries (up to 6.0 m). Point position, a (m) is measured horizontally from the centre of the left-hand portal column to the centre of the floor beam's bearing. It must be between 0 and the portal span.

Bracing Demand. Wind bracing units and Earthquake bracing units are the bracing demands this portal must resist, from the building's bracing design. Wind bracing units must be 0 or more; earthquake bracing units 0 to 400. As you enter the portal, roof and bracing inputs, the form shows the uplift on each column footing above the Analyse Portal button. It can be no more than 40 kN: above it the form says what to reduce, and the analysis waits until it is within the limit. The live figure leaves out the steel beam's own weight, so it reads a little higher than the column footing uplift in the calculations.

  • Column Height (m)Required

    0 to 4 m

    If not: “Column Height (m) must be > 0 m and <= 4.0 m.”

  • Portal Span (m)Required

    0 to 10 m

    If not: “Portal Span (m) must be > 0 m and <= 10.0 m.”

  • Roof Pitch (°)Optional

    °

  • Wind Bracing Units (BU)Required

    As shown on the form

  • Earthquake Bracing Units (BU)Required

    0 to 400

    If not: “Earthquake Bracing Units (BU) must be >= 0 and <= 400 BU.”

  • Section FamilyOptional

    UB · UC · PFC · ANY

  • Roof TypeRequired

    As shown on the form

  • Eaves Width (m)Optional

    m

  • Roof Span (m)Optional

    m

  • Roof Loaded Dimension (m)Optional

    m

  • Wall Cladding WeightRequired

    As shown on the form

  • Lower-storey wall claddingOptional

    As shown on the form

  • Wall Height (m)Optional

    0.3 to 4.8 m

    If not: “Wall Height (m) must be between 0.3 m and 4.8 m.”

  • Floor TypeOptional

    Timber Floor · Deck

  • Floor Span (m)Required

    m

  • Floor Beam Span, L (m)Optional

    Point loads

    m

  • Floor Beam Loaded Dimension (m)Optional

    Point loads

    m

  • Point Position, a (m)Optional

    Point loads

    m

Read from Bracing Portal Supporting Roof, Wall, Floor and Beams (CALC-041, version 4.1.0) as it runs today. The form may also show its own limit beside an input.

Worked example#

This is the Help Centre's recorded worked example, a garage portal under an upper storey with a floor beam bearing on it. It is not a design for your site.

Project Settings: Earthquake Zone 2, Soil Class C, Wind Zone High, Snow Zone N1, Elevation 50 m, Roof Pitch 25° and Geotechnical Ultimate Bearing Capacity 300 kPa.

Inputs: Portal span, B (m) 5; Column height, C (m) 2.7; Portal pitch (°) 0 (flat); Section family PFC; Roof type Light; Roof loaded dimension (m) blank; Eaves width, D (m) 0.6; Roof span, A (m) 8; Lower-storey wall cladding Light; Upper-storey wall cladding Light; Wall height (m) 2.4; Floor type Timber Floor; Floor span (m) 2 (half the 4.0 m joist span); one floor beam with Floor beam span, L (m) 4, Floor beam loaded dimension (m) 3 and Point position, a (m) 1.8; Wind bracing units (BU) 150; Earthquake bracing units (BU) 120.

The form shows "Uplift on each column footing: about 6.9 kN (the most allowed is 40 kN)." The calculator selects a 250 PFC 35.5 section, and the member shows Pass. With the floor beam's load, a strip enhancement is not enough for Type 1 or Type 2, so a pad is required under each column in every condition: 550 × 550 × 300 deep at Mark A, nearer the floor beam, and 500 × 500 × 300 deep at Mark B. The calculation can be accepted. The worked example guide and its video take the same design through to the issued documents.

Results#

Check the Status shows Pass before you accept

The Selected Portal Member table shows one row:

  • Member Designation: the steel section chosen for the beam and both columns.

  • Type / Group: the section family.

  • Max Defl Down (mm) and Max Defl Up (mm): the largest downward and upward deflections of the portal beam.

  • Rigidity Ratio and Capacity Ratio: from the portal beam's own beam check. The Rigidity Ratio is the smallest of deflection limit ÷ calculated deflection; the Capacity Ratio is bending capacity ÷ demand. 1 or more passes.

  • Status: Pass when the frame strength, the frame deflections, the bracing checks, the frame member checks, the column base connection and the beam check all pass.

How the section is chosen: the calculator tries the sections in your chosen family from lightest to heaviest. It takes the first one that passes the portal frame checks, then checks that section as a beam under the roof, wall, floor and floor beam loads. If the beam needs a heavier section, the frame is checked again with that section. The whole frame is then checked with the gravity loads and the bracing load together, member by member, to NZS 3404, including buckling of the beam and columns, and each column base is checked for the uplift and shear it carries against the cast-in bolts of the standard base detail to NZS 3101 (the drawing's base detail, with 25 MPa concrete and the column at least 300 mm from a slab end or corner). If either fails, the next heavier section is tried. The calculation PDF shows each check and the sections that were passed over.

Foundation conditions#

Each column is designed for three foundation conditions

Where a portal column lands is only known on site, so each column is designed for three foundation conditions, shown in the Foundation conditions assessed table:

  • Type 1 — Perimeter Edge Beam: the column stands on the slab's perimeter edge beam.

  • Type 2 — Internal Ground Beam: the column stands on an internal ground beam.

  • Type 3 — Isolated Pad: the column stands on its own pad.

For Type 1 and Type 2 the table gives a strip enhancement of the beam (its length, centred on the column, and its bars) and a pad. Where the strip enhancement is adequate the pad is an alternative; where it is not (Not available: strip enhancement not adequate) the pad is required. Type 3 always has a pad. Result must start with OK on every row. A floor beam off the middle of the span loads one column more than the other, so the table can show Mark A and Mark B separately, each with its own foundation.

The foundations are checked for the column's downward load, allowing for the load the walls and roof already put on the slab (Q*, from the wall claddings and roof type), and for its uplift. The wind uplift from the roof is reduced by the combination factor Kc = 0.8. Wind and earthquake uplift are each checked against the beam they lift on either side of the column, with the strip enhancement or the pad. All foundation concrete is 25 MPa.

The calculation PDF works these through and closes with the instruction to build the foundation of the condition found on site and, where a strip enhancement and a pad are both given for Type 1 or Type 2, to build one, not both. The drawings carry the same three conditions: the Foundation Condition Key sheet, then the strip enhancement and pad sheets.

After you accept, the calculations, project summary and drawings are prepared from Project Outputs. See Pay for and download your documents.

Limitations#

  • A single-bay portal. At least one floor beam is required, and no more than three. For roof, wall and floor without a floor beam, use Bracing Portal Supporting Roof, Wall, and Floor. For a portal carrying roof only, use Bracing Portal Supporting Roof Only.

  • The floor beams bring floor load only. They are not designed here; size them separately, for example with Floor Beam Supporting Floor.

  • There are no inputs for ridge or girder beam point loads, or for a cantilever.

  • Portal span, B (m) up to 10.0 m and Column height, C (m) up to 4.0 m, with the column no taller than the span.

  • The uplift on each column footing up to 40 kN, from the roof loads and the bracing units together.

  • A roof loaded dimension of no more than 7.0 m, a Floor span (m) of no more than 6.0 m, and a Wall height (m) from 0.3 to 4.8 m.

  • PFC, UB and UC sections only.

  • Accept needs a fully passing member and a standard foundation for every one of the three foundation conditions at each column.

Common errors and how to fix them#

  • "Project Settings wind zone is required before running this calculation." (or the same for snow zone, elevation, roof pitch, earthquake zone, soil class or geotechnical ultimate bearing capacity). Complete that setting in Project Settings and analyse again. See Project Settings missing.

  • "Wall Height (m) must be between 0.3 m and 4.8 m." Enter a wall height in that range.

  • "Must be <= 6.0 m" under Floor span (m) or Floor beam loaded dimension (m), or "Must be <= 10.0 m" under Floor beam span, L (m). Enter a value within the range shown under the field.

  • "Must be <= Portal Span (4 m)" under Point position, a (m) or Column height, C (m) (with your span). A floor beam must sit within the portal span, and the column cannot be taller than the span.

  • "Must be <= 4.0 m" under Column height, C (m), or "Column Height (m) must be > 0 m and <= 4.0 m." The column height can be no more than 4.0 m.

  • "This portal would put about ... kN of uplift on a column footing; the most allowed is 40 kN." The roof and the bracing units together would lift a column footing by more than 40 kN. The message says what to reduce: the portal span or the roof loaded dimension when the roof alone is over the limit, otherwise the bracing units (it says how many fit this portal) or the column height.

  • "Maximum of 3 point loads" beside Add Floor Beam Point Load. The calculator takes no more than three floor beams.

  • "Required: enter 0 for a flat beam" under Portal pitch (°). The pitch was left blank. Enter 0 for a flat beam, or the pitch of a pitched portal.

  • "pitch_deg (the portal pitch) must be between 0 and 45 degrees when supplied." The Portal pitch (°) can be no more than 45°.

  • "No section in the selected family passes the portal checks, the frame member checks (NZS 3404) and the base connection (NZS 3101) ..." Every section in your Section family fails a check of the whole frame or of its column bases: the message names the last one tried and the check it fails. On a long span it is usually the beam buckling between the knees; on a short, low portal with high earthquake bracing it is usually the base connection, where the uplift and shear exceed what the cast-in bolts can hold. Try another family, or ANY, a shorter span, or less bracing from this portal.

  • "Earthquake Bracing Units (BU) must be >= 0 and <= 400 BU." The calculator takes at most 400 earthquake bracing units from one portal: the standard base connection is not designed past it. Put the remaining bracing elsewhere in the building. See No member passes.

  • "No passing portal section found in the selected family." No section in your Section family passes for these loads and bracing units. Try another family, or ANY, and check the inputs. See No member passes.

  • "A fully passing final member is required before accepting". The member status is Fail. Change the inputs until the member passes.

  • "This calculation cannot be accepted or issued. Mark A, Type 1 (perimeter edge beam): no standard foundation could be designed for the support. A specific engineering design is required." No standard strip enhancement or pad works for that column in that foundation condition. See When no calculator fits.

  • "This calculation cannot be accepted or issued. No standard ArchiSuite detail covers this design: ..." The design has no standard connection drawing. The reason after the colon names the problem. For example: "Portal column and beam section families require different connection templates."

  • "Permission denied" when you update or delete. Only team admins and editors can change saved calculations. See Teams and permissions.

  • "This calculation has been accepted and paid for, so it cannot be changed. Use Revise Calculation on Project Outputs to make a revised version." See Revise an accepted calculation.

Worked example

Was this helpful?

Calculator guideBracing Portal Supporting Roof, Wall, and FloorSize a single-bay steel bracing portal that carries roof, a wall above and a timber floor, with its foundation designed for three foundation conditions.Read Calculator guideBracing Portal Supporting Roof OnlySize a single-bay steel bracing portal that carries roof loads only, from the wind and earthquake bracing units you enter, with its foundation designed for three foundation conditions.Read Calculator guideFloor Beam Supporting FloorSize a steel or timber beam that carries internal timber floor joists only, with a floor vibration check and slab-edge or pad checks under each end.Read How-toProject SettingsEvery field on the Project Settings page - what it means, the accepted options and limits, which calculators use it, and what happens to existing calculations when you change it.Read TroubleshootingProject Settings Missing or Out of RangeFix messages such as "Roof Pitch is missing or out of range…" or "Project Settings … is required before running this calculation" by completing Project Settings.Read TroubleshootingWhy an Input Is RefusedWhat the red messages under an input and the error toasts after Analyse mean, grouped by cause, with the fix for each.Read TroubleshootingNo Member PassesWhat the "No member passes - change the inputs." notice means on the lintel and beam calculators, and which inputs to check first.Read How-toCheck and Accept ResultsHow to read a calculator's results, choose a passing member, and press Accept so the calculation moves into Project Outputs.Read How-toPay and Download Your DocumentsPay for accepted calculations on Project Outputs, or send the property owner a payment link, then download the Project Summary, Calculations and Drawings.Read