What is a PS1 producer statement?
A PS1 is a design professional's signed opinion that a design meets stated Building Code clauses. Councils may rely on it; it has no status in the Act.
- Author
- ArchiSuite
- Checked against sources:
- Published:
On this page
A PS1 ("Producer Statement – Design") is a signed statement from a design professional, usually a Chartered Professional Engineer (CPEng), giving their professional opinion that a design will comply with stated Building Code clauses if it is built to the referenced drawings and specifications. Councils often ask for a PS1 with a building consent application for specifically designed work, such as engineered foundations, beams or retaining walls. A PS1 is not defined in the Building Act 2004. It is one piece of evidence a council may rely on when deciding whether it has reasonable grounds to grant the consent.
What are PS1, PS2, PS3 and PS4?#
There are four producer statements in common use (MBIE (opens in a new tab)):
| Statement | Name | What it says | Who typically signs | When it is used |
|---|---|---|---|---|
| PS1 | Design | The design will comply with the stated Building Code clauses if built as documented | The designer, usually a CPEng (or a registered architect for architectural design) | With the building consent application |
| PS2 | Design review | An independent reviewer has checked someone else's design and believes it will comply | An independent CPEng | With the consent application, often for complex or alternative-solution designs |
| PS3 | Construction | The work was built or installed as required | The contractor or specialist installer, such as a proprietary system installer | Before the code compliance certificate |
| PS4 | Construction review | The reviewer monitored construction and believes the work was completed to the consent | Usually the design engineer who did the construction monitoring | Before the code compliance certificate |
The standard PS1, PS2 and PS4 forms are produced by Engineering New Zealand and ACE New Zealand, originally with the New Zealand Institute of Architects (NZIA). PS3s are much more varied; a form commonly used is Schedule 6 of NZS 3910 (construction contract conditions). For design work that turns out to be exempt from building consent, the engineering bodies provide separate "A-series" forms (PS1A, PS2A, PS4A). The standard forms refer to a building consent, so they are not the right document for exempt work.
Who can sign a PS1?#
Engineering New Zealand's policy, restated in a joint practice alert in October 2025 (opens in a new tab), is that PS1, PS2 and PS4 statements should be signed by a CPEng who is working within their competence and is authorised by their firm. ACE New Zealand and Engineering New Zealand guidance describes the "suitably qualified independent design professional" as someone on a national competence-based register, meaning a CPEng or a registered architect.
Practice Note 1 adds that:
the author must be an individual, not a company, because the statement's value depends on that person's competence
the author should sign only for work within their own competence, though they may rely on other CPEngs in their firm
the standard form wording should not be altered; any limitations go in an attached schedule.
Councils normally check the author's credentials, for example on the CPEng register, before deciding how much to rely on a producer statement.
What is the legal status of a producer statement?#
Producer statements were a defined part of the old Building Act 1991. They have no statutory status under the Building Act 2004. MBIE describes them as having "no particular status" under the Act.
What the Act does say:
A building consent authority must grant a consent if it is satisfied on reasonable grounds that the Building Code would be met if the work were properly completed to the plans and specifications (s 49).
Section 19 lists what a council must accept as establishing compliance: Acceptable Solutions, Verification Methods, determinations, product certificates, MultiProof approvals and similar. Producer statements are not on that list.
So a PS1 is supporting evidence, not proof. The council decides whether to accept it and how much weight to give it, usually with some level of its own review. Practice Note 1 says a council can reasonably ask for a PS1. If one is not provided, the council has to assess compliance another way, for example by having its own engineer review the design. It should not refuse a consent simply because there is no producer statement.
A producer statement is a professional opinion. It is not a product warranty, and it does not promise that the building complies. Practice Note 1 also stresses that producer statements were not designed to transfer the council's risk and liability to the designer. All building work must still comply with the Building Code (s 17).
What does a PS1 contain?#
Based on the standard form and Practice Note 1, a PS1 should set out:
Who: the design firm, the signing person's name, CPEng number and qualifications, and the owner it was prepared for
Where and what: the site address and legal description, a description of the building work, and whether the statement covers all or only part of the work. Engineers' PS1s often cover only the specifically designed parts.
Which Code clauses: for example B1 Structure. A separate PS1 may be needed for each clause.
How compliance is shown: an Acceptable Solution, a Verification Method, or an alternative solution described in an attached schedule
The documents: the titles and numbers of the drawings, plus the specification and other documents in an attached schedule
Assumptions and limits: design assumptions that must be verified on site (such as ground conditions), and reliance on proprietary products meeting their specifications
Construction monitoring: the recommended level of engineering monitoring, from CM1 to CM5
Insurance and liability: a statement about the firm's professional indemnity insurance and the limit of liability.
A PS1 should come with the supporting calculations and, often, a design features report, enough for another competent engineer to check the method.
How do councils use PS1 and PS4 together?#
At consent stage, the PS1 (and any PS2) helps the council decide it has reasonable grounds to grant the consent. The council may then make it a consent condition that the engineer monitors specified stages of construction and provides a PS4 before the code compliance certificate is issued. MBIE notes the design engineer is often best placed to do that monitoring, because they understand the design assumptions.
For residential restricted building work, MBIE says it is good practice to attach the relevant producer statements to the designer's certificate of design work and reference them in it. Restricted building work must still be carried out or supervised by a Licensed Building Practitioner (LBP), even if an engineer is monitoring construction. Chartered Professional Engineers are deemed to be licensed in the LBP Design and Site classes.
What should you do if your project needs a PS1?#
Engage the engineer early, and agree the scope: which elements, which Code clauses, and whether construction monitoring and a PS4 are included. MBIE advises making sure the engagement covers any producer statements the council will want at completion.
Make sure the PS1 lists the same drawing numbers and revisions you lodge with the council, and get it updated if the design changes.
Read the site assumptions on the PS1 (for example the assumed ground conditions) and make sure they are checked on site.
Book the engineer's inspections at the stages in your consent conditions. The engineering bodies advise that an engineer should not issue a PS4 for work where no PS1 was issued.
Key points#
A PS1 is a designer's professional opinion that a design will comply with stated Building Code clauses; PS2 is design review, PS3 is construction and PS4 is construction review.
Engineering New Zealand policy is that PS1, PS2 and PS4 are signed by a CPEng working within their competence.
Producer statements have no statutory status under the Building Act 2004; councils decide how much to rely on them under the reasonable-grounds test.
A good PS1 names the Code clauses, compliance method, drawings, assumptions and construction monitoring level.
Exempt work uses the separate A-series producer statements, not the standard PS1.
Sources
- Producer statements (opens in a new tab) - MBIE (building.govt.nz) (accessed 20 November 2026)
- Building Act 2004 (version as at 8 October 2026) - sections 17, 19, 49 (opens in a new tab) - New Zealand Legislation (accessed 20 November 2026)
- Practice Note 1 - Guidelines on Producer Statements (Version 3, January 2014) (opens in a new tab) - ACE New Zealand and Engineering New Zealand (accessed 20 November 2026)
- Guidance on use of producer statements (PS1, PS2 and PS4) (opens in a new tab) - ACE New Zealand, Engineering New Zealand and NZIA (accessed 20 November 2026)
- Practice Alert - Defining scope for construction monitoring (8 October 2025) (opens in a new tab) - ACE New Zealand, CEAS and Engineering New Zealand (accessed 20 November 2026)
- Producer statements and quality documents (opens in a new tab) - ACE New Zealand (accessed 20 November 2026)
- Work you can do without a building consent (opens in a new tab) - MBIE (building.govt.nz) (accessed 20 November 2026)
General information about New Zealand rules, not advice for a particular project. Your council confirms whether your project needs building consent, and a suitably qualified professional should check any design.